한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Holiday Himalaya Khatang Expedition 2025

Khatang · 2025 · 가을 (3) · Switzerland

원정 개요

Approach: To Taksindu from KTM by Jeep. Then trek via Dudh Kunda.

BC 27/09 2700m at northern shore of Dudh Kunda Lake
ABC 02/10 5300m at snowy plateau at the foot of Khatang South Face.
Hpt 5300n at ABC

Climb abandoned on 14/10 at ABC due to snow conditions, and altitude sickness of Sala.

Plan A was to climb a new route on the South Face in about 4-5 days from ABC to the top. Plan B was SE Ridge. They had planned on fixing some rope in the lower part of the South Face, which they figured was the most technical and dangerous part of the face.

Sala got altitude sickness at first night at ABC on 02/10. He went down to BC the next day and recovered a little, others stayed at ABC for another night. On 03/10 and 04/10 lots of snowfall, forcing Siegrist and Schuepbach to go down to BC on 04/10.

Everyone down to lodges below Dudh Kundha Lake. Went up again to ABC after the snow, but eventually abandoned attempt on 14/10. Left BC on 14/10.

Climbing route: South Face

Oxygen: Not taken, not used

  • 내부 원정 ID11801
  • 원본 EXPIDKHAT25301
  • 대장Stephan Siegrist
  • 루트 (Route)S Face
  • 최고 도달고도5300m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 3명

이름국적역할정상 등정산소사망
Stephan SiegristSwitzerlandLeader---
Filippo SalaSwitzerlandClimber---
Silvan SchuepbachSwitzerlandClimber---

출처·참고문헌

연결된 원본 Reference가 없습니다.