한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Adventure Peaks Ama Dablam Expedition 2018

Ama Dablam · 2018 · 가을 (3) · UK

원정 개요

BC 26/10 4600m
C1 31/10 5400m
C2 01/11 5700m
Smt 02/11 by Lussi, Phurba Wangchhu Sherpa.

Lussi and Phurba Wangchhu set off from C2 at 1 am, reached summit at 8 am, down to BC at 4 pm. It was getting windy, team was at the end of a good weather period. Summit very exposed and very windy.

Michie and Zorro reached C1 on 31/10. They decided not to go higher because of difficulty of climb.

Ang Dawa and Noble got to 5600m on 01/11. Noble had a bad cough and was afraid of HAPE and decided to not climb higher.

Team left BC on 03/11.

Hired:
Ang Dawa Sherpa (5600m)
Phurba Wangchhu Sherpa (S)

  • 내부 원정 ID9961
  • 원본 EXPIDAMAD18314
  • 대장Paul Noble
  • 루트 (Route)SW Ridge
  • 최고 도달고도6814m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 6명

이름국적역할정상 등정산소사망
Paul NobleUKLeader---
Devis Orlando LussiSwitzerlandClimber성공--
Kenneth MichieUKClimber---
Joao Filipe Da Silva ZorroPortugalCilmber---
Phurba Wangchhu SherpaNepalH-A Worker성공--
Ang Dawa SherpaNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.