Kobler & Partner Ama Dablam Expedition 2018
Ama Dablam · 2018 · 가을 (3) · Austria
원정 개요
BC 19/10 4700m
C1 23/10 5800m
C2 24/10 6100m
Smt 25/10 by Neuschmid, Vetter-Aebli, Thomma, Kusang Tenzing Sherpa at 8 am.
Summit team left left C2 at midnight. It was cold (-20C) and clear. They spent about half an hour on the summit, then descended to C2, packed up and continued to C1, where they arrived at 5 pm.
Sieveking never reached Ama Dablam BC. After crossing Cho La on 17/10 he developed a problem with his lungs and was evacuated by helicopter.
Schittich reached 6000m on 24/10. She did not feel strong enough to continue and turned back to BC with Tashi Sherpa.
On 26/10, everybody down at BC.
- 내부 원정 ID9953
- 원본 EXPIDAMAD18306
- 대장Andreas Neuschmid
- 루트 (Route)SW Ridge
- 최고 도달고도6814m
- 정상 등정 성공예
- 산소 사용미사용·확인 필요
- 종료 사유정상 등정 성공 (1)
참가자 7명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Andreas Neuschmid | Austria | Leader | 성공 | - | - |
| Isabel Ingrid Schittich | Germany | Climber | - | - | - |
| Stefan Sieveking | Germany | Climber | - | - | - |
| Markus Thomma | Switzerland | Climber | 성공 | - | - |
| Martina Vetter-Aebli | Switzerland | Climber | 성공 | - | - |
| Kusang Tenzing Sherpa | Nepal | H-A Worker | 성공 | - | - |
| Tashi Chhiring (Tashi Tshering) Sherpa | Nepal | H-A Worker | - | - | - |
출처·참고문헌
https://www.kobler-partner.ch/news/ama-dablam-expedition-2018-summit-erreicht-2/ · 2018 · 웹사이트 (5) ·