한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Swiss Makalu Expedition 2018

Makalu · 2018 · 봄 (1) · Switzerland

원정 개요

BC 16/04 4800m
ABC 17/04 5700m
C1 -- --
C2 24/04 6600m by Valloton
HPt 11/05 around 7100m by Mindu Sherpa.

Valloton went trekking in the Khumbu beforehand and then took a helicopter to Hillary BC. When Valloton reached C2 for the first time, Mindu was with her. They set up camp and stayed on night. On 25/04 they descended to ABC as it was very windy. The winds continued for a few days, but when the weather got better Valloton ascended to C2 a few times.

On 10/05 Mindu left ABC to get ahead to C3 one day before Valloton to set up camp. Valloton left on 11/05 and when she reached C2 Mindu was on his way to C3. He did not reach all the way to C3 as it was too late. They spent another night at C2 and the following day was too windy to continue. On 13/05, Mindu got sick and they descended. On 14/05 they were picked up by helicopter to Lukla and then Kathmandu.

On 16/05 Valloton took a flight to Lukla as she was supposed to go to Everest. However, her promised helicopter ride from Lukla to EBC never materialized so she came back to Kathmandu on 18/05.

Oxygen: not taken, not used

Sherpa:
Mindu Chhiri, Kurima, Lokhim-9, 29/08/1971

  • 내부 원정 ID9931
  • 원본 EXPIDMAKA18104
  • 대장Josette Valloton
  • 루트 (Route)Makalu La-NW Ridge
  • 최고 도달고도7100m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유질병 (7)

참가자 2명

이름국적역할정상 등정산소사망
Josette VallotonSwitzerlandLeader---
Mindu Chhiri SherpaNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.