한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Australian Khatang Winter Expedition

Khatang · 1984 · 겨울 (4) · Australia

원정 개요

BC southeast side of Tsho Og, 200m southeast of Japan 82 autumn BC
C1 start of climb, base of North Face (or NW Face)
C2 on face
C3 on face
High point on face.

BC abandoned on 18 Dec because struck by 130-kph wind and destroyed climb which was semi-alpine-style. 10 days of no snow but high winds, spindthrift and little rockfall. Real hazard was rock falling. Hit moraine approaching face. Maximum temperature at C3 was -20 degrees. Technically not an easy climb on steep face of ice or unconsolidated snow 1-1/2 ft on rock. Problem to find camp sites (didn't have equipment for hanging camps). NE Ridge looked beyond their capabilities on its jagged rock cornices and gendarmes. Descended to a new BC at 3950m on 29 Dec (at Lundung Kharka).


Banskota, Tourism - 31 Dec 1984

BC 13 Dec 4820m due strong wind BC moved down to Lumding Kharki 4000m 17 Dec
C1 20 Dec
C2 21 Dec 5350m
C3 25 Dec 5900m

Because of technical nature of climbing making it time-consuming, food and fuel supplies exhausted (had only 7 days supply). Abandoned 27 Dec after reaching 6050m by both members. In BC 29 Dec and left 30 Dec for trek.

-20 degrees daily temperature with gusting winds 130 km/hr and spindtrift avalanche regular occurrence.

  • 내부 원정 ID979
  • 원본 EXPIDKHAT84401
  • 대장John Lamb
  • 루트 (Route)NW Face
  • 최고 도달고도6100m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유보급·장비 (8)

참가자 2명

이름국적역할정상 등정산소사망
John Thomas LambAustraliaLeader---
Raymond Peter VranAustraliaClimber---

출처·참고문헌

Cheney, Michael J. & Hawley, Elizabeth · 1984 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12198527703/Asia-Nepal-Khatang-Attempt · 1984 · 웹사이트 (5) ·