한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Patagonia Mountain Agency (PMA) Ama Dablam Expedition 2017

Ama Dablam · 2017 · 가을 (3) · Poland

원정 개요

BC 23/10 4500m (Ama Dablam Lodge)
ABC 24/10 5400m
C1 25/10 5700m
C2 26/10 6000m
Smt 27/10 by Berendt and Nowak.

Team started for summit from C2 at 2 am, Nowak reached top at 11 am, Berendt at 12 pm. Nowak waited on the summit for Berendt, weather was very good, not much wind. They descended together to C2 (arrival: 9 pm), on 28 Oct they went down to Ama Dablam Lodge.

Strelau and Bulczak were one day behind the rest of the group. They together with Lhakpa Nuru Sherpa started summit push from C2 at 1 am on 28 Oct. Bulczak didn't feel well and had some problems with his eyes. He turned around with Lhakpa Nuru at 6500m at 1 pm. They went down to C2, arriving at 7 pm. Strelau went on, but had to turn at 6700m at 4 pm because he was too slow and ran out of power. He was back at C2 at 10 pm. Next day Strelau, Bulchak and Lhakpa Nuru went down to Pangboche.
Kowalski only made it up to C2.

Pawlowski was the leader of the group, but was not on permit and never intended to climb himself. Wiktor Wajda climbed Island Peak with the group but wasn't on AMAD permit either.

Team left BC on 29 Oct.

Oxygen; Not taken not used.

Hired:
Lhakpa Nuru Sherpa, Phortse, 18/06/1980

  • 내부 원정 ID9570
  • 원본 EXPIDAMAD17307
  • 대장Ryszard Pawlowski
  • 루트 (Route)SW Ridge
  • 최고 도달고도6814m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 7명

이름국적역할정상 등정산소사망
Ryszard Jan PawlowskiPolandLeader---
Agnieszka BerendtPolandClimber성공--
Dariusz Piotr BulczakPoland/USAClimber---
Norbert Miler KowalskiPolandClimber---
Bartlomiej Edward NowakPolandClimber성공--
Karol Jacek StrelauPolandClimber---
Lhakpa Nuru SherpaNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.