한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Rolwaling Excursions Everest Expedition 2017

Everest · 2017 · 봄 (1) · Nepal

원정 개요

BC 18/04 4900m
ABC 29/04 6400m
C1 03/05 7000m (and 18/05)
C2 19/05 7650m
C3 20/05 8200m
Smt 21/05 by Akerberg, Ang Mingma at 7 am
Smt 22/05 by Breckheim and Chhiring Dorjee at 8:20 am,
Machnik and Pasang Lama at 8:10 am.

21 May summit team left C3 at 11 pm on 20 May. Weather was calm, warm up to about 8700m, when it got a bit windy and cold. On the summit it was windy and cold. They stayed up there for about 15 minutes, then descended to ABC, where there arrived at 9 pm. Akerberg descended to CBC on 22 May.

Machnik and Pasang Lama left 1:10 am and Breckheim and Chhiring Dorjee left at 12:30 am. The weather was calm and sunny. Straightforward climb. They spent about 40 minutes on the summit and descended to C3, where Machnik and Pasang Lama arrived at 2 pm; Breckheim and Chhiring Dorjee at 3 pm.

On 23 May, all down to ABC. Very windy day. They stayed at CBC for 3 nights to make sure everything was clean. Left ABC on 24 May and BC on 28 May.

Oxygen: Taken and used from C1 to top to C1 by member and Sherpas.

Sherpas:
Mingma (Ang Mingma), Yilajung, 21/02/1968
Pasang Lama Bhote, Hungung, Hatiya, 17/10/1984

  • 내부 원정 ID9544
  • 원본 EXPIDEVER17181
  • 대장Chhiring Dorje Sherpa
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 6명

이름국적역할정상 등정산소사망
Chhiring Dorje SherpaNepalLeader성공사용-
Erik AkerbergSwedenClimber성공사용-
Benjamin James BreckheimerUSAClimber성공사용-
Grazyna Dorota MachnikPolandClimber성공사용-
Pasang Lama BhoteNepalH-A Worker성공사용-
Mingma (Ang Mingma) SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.