한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Kobler & Partner Everest Expedition 2017

Everest · 2017 · 봄 (1) · Switzerland

원정 개요

BC 16/04 4900m
ABC 25/04 6400m
C1 29/04 7050m
C2 25/05 7650m
C3 26/05 8200m
Smt 27/05 by all members (apart from Kobler and Schittich), Dendi, Kusang,
Gelu, Nuru Wangchu, Mingma Dendi, Gyalgen, Nima, Lhakpa Temba,
Lhakpa and Tenji between 4:30 am and 5:30 am.

Summit team left C2 at 10 pm. Weather was calm and clear. Straightforward climb. They spent between 30 minutes and one hour on the summit. They descended to C1, where they had a rest and then carried on to ABC, where they arrived at 3:30 pm.

They saw Kilian Jornet going up at about 8300m (where the body of the Australian climber Frank Marchetti was) at about 9 am on his way to the summit.

Schittich reached C2 on 25 May and decided to abandon the climb as she did not feel strong enough. She descended to ABC on 26 May.

Kobler stayed at ABC as BC manager.

Team left ABC on 28 May.

Fixed rope:
Up to 8300m by Chinese, rest by Arun Treks and Kari Kobler Sherpas.

Oxygen: Taken and used from C1 to summit to ABC by members and Sherpas.

  • 내부 원정 ID9536
  • 원본 EXPIDEVER17173
  • 대장Kari Kobler
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 22명

이름국적역할정상 등정산소사망
Karl Robert (Kari) KoblerSwitzerlandLeader---
Julian Benedikt BeermannGermanyClimber성공사용-
Holger Franz Ludwig BirnbraeuerGermanyClimber성공사용-
Mark CadmanUKClimber성공사용-
Angus McDougall CaithnessAustraliaClimber성공사용-
Paul Graham FoxUKClimber성공사용-
Bruno HufschmidSwitzerlandClimber성공사용-
Mark Hans IneichenSwitzerlandClimber성공사용-
Karsten LafrenzGermanyClimber성공사용-
Isabel Ingrid SchittichGermanyClimber-사용-
Julia Elinor SchultzGermanyClimber성공사용-
Klaus Roger TscherrigSwitzerlandClimber성공사용-
Dendi SherpaNepalSirdar성공사용-
Gyalzen SherpaNepalH-A Worker성공사용-
Kusang Tenzing SherpaNepalClimbing Sirdar성공사용-
Lakpa Temba SherpaNepalH-A Worker성공사용-
Lhakpa SherpaNepalH-A Worker성공사용-
Lhakpa Gelu SherpaNepalH-A Worker성공사용-
Mingmar Dendi SherpaNepalH-A Worker성공사용-
Nima SherpaNepalH-A Worker성공사용-
Nuru Wangchu SherpaNepalH-A Worker성공사용-
Tenji SherpaNepalH-A Worker성공사용-

출처·참고문헌

https://www.kobler-partner.ch/de/reisebericht/einmal-mehr-erfolg-am-mt-everest · 2017 · 웹사이트 (5) ·