한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

West Bengal Dhaulagiri Expedition 2017

Dhaulagiri I · 2017 · 봄 (1) · India

원정 개요

BC 14/04 4650m
C1 22/04 5600m
C2 06/05 6500m
C3 19/05 7430m
Smt 20/05 by Ghosh and Bir Kaji Tamang.

Ghosh and Bir Kaji Tamang after having six hours rest, left 3 at 10:19 pm on 19 May and reached summit at 4:12 pm on 20 May. They spent 20 minutes on the summit, then started descending. When they reached at the bottom of main couloirs Ghosh heard that somebody is asking for water and a tent. That was one of the climbers of ITBP Biman Biswas. The weather was bad and getting late too. For a moment Ghosh could not decide what to do. His Sherpa was asking him to leave the person and to move down. But Ghosh decided to help Biswas and told him to move along with him, but he was very exhausted and completely disoriented. Somehow Ghosh managed to bring down Biswas to C3 and handed him over to the Sherpa inside the tent. It was 5 pm on 21 May. On the summit ahead of Ghosh there Migel, one Slovak, Pedro's team, Maria and Sherpa, Lakpa, Kazi and Ghosh was the last one.

Fixed rope: Contributed 100m rope plus bonus amount.

Oxygen: C3 to smt to C3; Sherpa from 7800m to smt to 7800m.

Accidents: frostbite both hands and left toe while rescuing a climber from ITBP Biman Biswas who was stuck at 8000m starting point of couloir without oxygen and water.

  • 내부 원정 ID9412
  • 원본 EXPIDDHA117109
  • 대장Dipankar Ghosh
  • 루트 (Route)NE Ridge
  • 최고 도달고도8167m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 2명

이름국적역할정상 등정산소사망
Dipankar GhoshIndiaLeader성공사용-
Bir Kaji TamangNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.