한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Haute Tarentaise Dhaulagiri Expedition

Dhaulagiri I · 1986 · 가을 (3) · France

원정 개요

BC at normal site
C1 just above icefall
C2 at Col
High point at snow slope below steep ridge.

Late Sept a lot of snow: 27 Sept more than 1 meter snow at BC, so stayed in BC for 7 days while snow kept falling. 2 Oct started up from BC and on 3rd reached C2 but camp in bad condition and avalanching going on. Stayed 4 days at C2 with one day 40 cm snowfall. 4 Oct tried to reach C3 site at 6300m but could not go above 6100m because very dangerous snow ("we swam in snow"), so down to BC 6th Oct and called off climb because no chance to reach summit. 1st Oct was big avalanche from top of Dhaulagiri and its blasts of air hit BC. Left BC 8 or 9 Oct.

  • 내부 원정 ID941
  • 원본 EXPIDDHA186303
  • 대장James Merel
  • 루트 (Route)NE Ridge
  • 최고 도달고도6100m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 5명

이름국적역할정상 등정산소사망
James MerelFranceLeader---
Pierre BeguinFranceClimber---
Christian BougnaudFranceClimber---
Michel PoencetFranceClimber---
Regis RollandFranceClimber---

출처·참고문헌

Cheney, Michael J. & Hawley, Elizabeth · 1986 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12198725601/Asia-Nepal-Dhaulagiri-Attempt · 1986 · 웹사이트 (5) ·