한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Italian Annapurna I Expedition

Annapurna I · 1986 · 가을 (3) · Italy

원정 개요

BC at normal site
Deposit in moraine (rock)
Biv2
Biv2 on wall left of cycle.

Started from C1 on 19th Sept with small tent and slept that night at 5500m. 20th bived at 6900m directly below E Annapurna summit, a good place, below big seracs with no problem of small avalanches (were on French route). 21st to summit from 6900m at 1:45 pm (left biv at 4:00 am, returned to tent at 6900m at 5:30 pm). Difficult from 2nd biv, difficult ice climbing (because big avalanche had carried all snow away). Had problem of descent and so put fixed rope at places (had total only 650m rope - cut it). 22nd slept in C1 and 23rd to BC (day French member killed by loose piton).

  • 내부 원정 ID938
  • 원본 EXPIDANN186301
  • 대장Sergio Martini
  • 루트 (Route)N Face (French rte)
  • 최고 도달고도8091m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 3명

이름국적역할정상 등정산소사망
Sergio MartiniItalyLeader성공--
Fausto De StefaniItalyClimber성공--
Almo GiambisiItalyClimber성공--

출처·참고문헌

Martini, Sergio · 1986 · 학술지·저널 (2) · AAJ
· 1986 · 잡지 (3) · MM
http://publications.americanalpineclub.org/articles/12198725001/Asia-Nepal-Annapurna · 1986 · 웹사이트 (5) ·