한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Adventure Peaks Himlung Himal Expedition 2016

Himlung Himal · 2016 · 가을 (3) · UK

원정 개요

Updates and Leader: Paul Noble

9th November
Congratulations again to Paul, Sam, Irene, Jorge, Lakpa, Dawa and Phurba who reached the summit of Himlung Himal. The full team are now trekking out and are at Koto.

5th November
Summit Success! Paul has phoned in to say that they have reached the summit of Himlung Himal. Shamin and Nigel turned back as it was an extremely cold night.

1st November
Paul has been in touch to let us know that the group have completed their acclimatisation programme and are looking at the moment for a likely summit on Saturday.

24th October
Paul has phoned in to say that the group are now at Base Camp and have thoroughly enjoyed their stunning trek in. Today they have had the puja which is the blessing for the team, sherpas and all their kit and tomorrow they will head for camp 1.

20th October
No landslides were present this year so the team were able to drive as far as Koto. All the equipment was re-packed and checked ready for the start of their 4 day trek to base camp, through the Gates of Phu (pronounced Pooh!), taking the group through some amazing mountainous scenery, which is very different to the other trekking areas in Nepal.

  • 내부 원정 ID9289
  • 원본 EXPIDHIML16311
  • 대장Paul Noble
  • 루트 (Route)W Ridge
  • 최고 도달고도7126m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 8명

이름국적역할정상 등정산소사망
Paul NobleUKLeader성공--
Irene CleaverUKClimber성공--
Nigel Gareth CleaverUKClimber---
Jorge Egocheaga RodriguezSpainClimber성공--
Samantha Anne Marie NobleUKClimber성공--
Dawa Rinje (Darinje) SherpaNepalH-A Worker성공--
Lakpa SherpaNepalH-A Worker성공--
Phurba Ongel SherpaNepalH-A Worker성공--

출처·참고문헌

https://www.adventurepeaks.com/himlung-himal-expedition-oct-16/ · 2016 · 웹사이트 (5) ·