한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Germans on Tukuche

Tukuche · 2013 · 가을 (3) · Germany

원정 개요

The team met with difficult snow and weather conditions already during the approach by the Dhaulagiri tour (snow from 4800m; blocked for 3 days at the Japanese base camp). So after one attempt of Tukuche (with snow up to the hips) and after the team could reach the summit of Dhampus in heavy snow, they decided to finish the expedition as the conditions were becoming even worse. In fact, the descent from BC was rendered difficult by the snow.

Summit of Dhampus on the 23 October by the Merk, Spindler and Uttendorfer at 11:30 am by the western ridge.

  • 내부 원정 ID8319
  • 원본 EXPIDTUKU13301
  • 대장Wolfgang Uttendorfer
  • 루트 (Route)N Ridge
  • 최고 도달고도5500m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 4명

이름국적역할정상 등정산소사망
Wolfgang UttendorferGermanyLeader---
Reinhold Rudolf HarbichGermanyClimber---
Heike Andrea MerkGermanyClimber---
Helge Thorolf SpindlerGermanyClimber---

출처·참고문헌

연결된 원본 Reference가 없습니다.