Ama Dablam Expedition
Ama Dablam · 2013 · 가을 (3) · Austria
원정 개요
High point at 6350m at beside Dablam glacier.
Email from Peter Widhalm - 22 December 2013
Group has arrived in BC 1 November. November 4 load carry to C1 and pitched tent there. November 12 I climbed to C2 and spent the night there all alone.
The Sherpas of Alpenglow Expedition had fixed ropes a little above C3 on November 11. So I decided to try the summit on November 13th. All alone I have climbed on the ropes up to Mushroom Ridge, continued on the new ropes of Alpenglow to C3 and above to the end of the ropes. I continued from there around 100-150m in altitude without ropes to end up beside the Dablam glacier. There I decided to turn arond due to the relatively soft snow and the very steep face. This was at around 6350m. After the attempt on November 13th I descended to BC to arrive BC in the evening. Climb was finished for me then.
- 내부 원정 ID8278
- 원본 EXPIDAMAD13333
- 대장Peter Widhalm
- 루트 (Route)SW Ridge
- 최고 도달고도6350m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유기술적 난이도 (10)
참가자 1명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Peter Widhalm | Austria | Leader | - | - | - |