한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Italian-Swiss Everest 2013

Everest · 2013 · 봄 (1) · Italy

원정 개요

In acclimatization climb for Everest attempted on 28 April Moro, Steck climbed up to C3 on Lhotse face in front of rope fixing Sherpas. When they reached 7300m, the Sherpas were upset with them as they were in front of them. The team finished fixing the rope from 7000m to 7700m and descended to C2. There they tried to settle situation with Sherpas, but the Sherpas were so angry they attacked the three. Other climbers intervened to diffuse the situation. At 5 pm they left C2 as they were told by Sherpas and descended to BC.

Steck reached the top of West Shoulder on 19 April. Steck took 4 hours to get to top of West Shoulder at about 7500m. Moro stayed at C2 and Griffith was at BC.

High point for Moro and Griffith was 7300m on 28 April.

  • 내부 원정 ID8076
  • 원본 EXPIDEVER13184
  • 대장Simone Moro
  • 루트 (Route)SW Face
  • 최고 도달고도7500m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유기타 (14)

참가자 3명

이름국적역할정상 등정산소사망
Simone MoroItalyLeader---
Jonathan Robert Donald GriffithUKClimber---
Ueli SteckSwitzerlandClimber---

출처·참고문헌

연결된 원본 Reference가 없습니다.