한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Rolwaling Excursion Everest 2013

Everest · 2013 · 봄 (1) · USA

원정 개요

BC 21 Apr 5350m
C1 27 Apr 6000m
C2 28 Apr 6400m
C3 02 May 7300m
C4 21 May 7900m
Smt 23 May by Klinke, Johnson, Meyer, Hallstrom, Cieszewski, Rimbawan, Luthpi,
Tashi, Furtemba, Damai Chhiri, Lhakpa Tshering, Nima Kanchha, Angdu,
Mingma Chhiri, Shyam Bahadur Tamang at 5 am.

Team arrived at South Col at 10 am on 21 May. They were intending to summit on 22 May, but weather was bad at 9:30 pm, so they deferred to 23 May for a summit attempt. Summit team and Wroblewski left C4 between 8 pm and 9:30 pm. Weather was calm and clear. At 9 pm Wroblewski turned back at 8100m due to lack of motivation. Rest of team continued. Spent 20 minutes on the summit and descended to C2, where they arrived at 6 pm. Wroblewski had waited at C4 for them and descended to C2 with them. On 24 May to BC.

Sherpas:
Angdu, Gaurishankar-3, Dolakha, 10/9/79
Mingma Chhiri, Beding, Dolakha, 19/1/72
Damai Chhiri, Sikli, Jubing, 19/6/75
Furtemba (Phurba Temba), Gaurishankar-3, Dolakha, 11/10/84
Syam Bahadur Tamang, Simigaon, Ghaurishankar-3, Dolakha, (2036/7/7)
Lhakpa Tshering, Namche-3, Khumbu, (2040/7/25)
Nima Kanchha, Thame, Khumbu, (2036/5/14)
Tashi, Namche, Namche-3, (2036/1/05)

  • 내부 원정 ID8054
  • 원본 EXPIDEVER13155
  • 대장Christopher Klinke
  • 루트 (Route)S Col-SE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 18명

이름국적역할정상 등정산소사망
Christopher John (Chris) KlinkeUSALeader성공사용-
Fajri Al LuthfiIndonesiaClimber성공사용-
Piotr Marek CieszewskiPolandClimber성공사용-
Claes Torbjorn HallstromSwedenClimber성공사용-
Brad Allen JohnsonUSAClimber성공사용-
Eric Fredrick MeyerUSAClimber성공사용-
Hari Thomas MixUSAClimber---
Martin RimbawanIndonesiaClimber성공사용-
Jerald Lee (Jerry) SiskUSAClimber---
Bartlomiez Piotr (Bart) WroblewskiPolandClimber---
Angdu SherpaNepalH-A Worker성공사용-
Damai Chhiri SherpaNepalH-A Worker성공사용-
Lhakpa Tshering SherpaNepalH-A Worker성공사용-
Mingma Chhiri SherpaNepalH-A Worker성공사용-
Nima Kanchha SherpaNepalH-A Worker성공사용-
Phurba Temba (Furtemba) SherpaNepalH-A Worker성공사용-
Tashi SherpaNepalH-A Worker성공사용-
Shyam Bahadur TamangNepalH-A Worker성공사용-

출처·참고문헌

http://k2klinke.blogspot.com/ · 2013 · 웹사이트 (5) ·