한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Giripremi Lhotse Everest 2013

Lhotse · 2013 · 봄 (1) · India

원정 개요

The five-member team reached C3 on the West Face of Lhotse on 14 May. From there, Mane with two Sherpas, Lhakpa Dorje and Pasang, went for the summit of Lhotse while the other four members went to the South Col and to their C4 there for Everest.

Mane and his Sherpas made the final camp for Lhotse at 7800m on 15 May, left the camp at 2:00 am the next day (the 16th) and summited at 7:24 am. They descended to C2 in the Western Cwm (6500m) at 3:00 pm.

Everyone was back in BC on the 18th.

Oxygen:
Used by members climbing above C3 to their summits (but not in) C4
The Sherpas were on oxygen from C4 to their summits to and in C4

Sherpas:
Lhakpa Dorje Sherpa, 1/10/65, Chitre, Sotang, Solu, Everest X7, Lhotse X1
Pasang Sherpa, 20/12/83, Tapting-1, Solu, Lhotse X1

  • 내부 원정 ID7998
  • 원본 EXPIDLHOT13102
  • 대장Umesh Zirpe
  • 루트 (Route)W Face
  • 최고 도달고도8516m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 7명

이름국적역할정상 등정산소사망
Umesh Mallikarjun ZirpeIndiaLeader---
Bhushan Uday HarsheIndiaClimber---
Anand Shivling MaliIndiaClimber---
Ashish Sharad ManeIndiaClimber성공사용-
Ganesh Krishna MoreIndiaClimber---
Lhakpa Dorje SherpaNepalH-A Worker성공사용-
Pasang SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.