Alpenglow Everest Expedition 2013
Everest · 2013 · 봄 (1) · UK
원정 개요
Team left C4 at 2:10 am on 17 May. Windy at col, but no wind during climb. Climb was straightforward. Spent 10 minutes on summit. Descended to C4 at 9:55 am. Carried on at noon down to C2, arrived at 3 pm. On 19 May packed up C2 and skied down to C1 in 20 minutes.
Team had planned to climb Lhotse after Everest. However, as they wanted to ski and there was not enough snow in the couloirs, so they abandoned the climb.
Sherpas:
Dorje Sonam, Phortse, Khumbu, 24/5/81
Pasang Rinji, Phortse, Khumbu, 18/1/77
Karma Gyalzen, Phortse, Khumbu, 23/4/87
Tenjing Gyalzen, Phortse, Khumbu 2/7/91
- 내부 원정 ID7994
- 원본 EXPIDEVER13151
- 대장Adrian Ballinger
- 루트 (Route)S Col-SE Ridge
- 최고 도달고도8849m
- 정상 등정 성공예
- 산소 사용사용
- 종료 사유정상 등정 성공 (1)
참가자 6명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Adrian John Ballinger | UK | Leader | 성공 | 사용 | - |
| Sergei Baranov | Russia | Climber | 성공 | 사용 | - |
| Dorje Sonam Gyalzen Sherpa | Nepal | H-A Worker | 성공 | 사용 | - |
| Karma Gyalzen (Karma Gelgen) Sherpa | Nepal | H-A Worker | 성공 | 사용 | - |
| Pasang Rinji Sherpa | Nepal | H-A Worker | 성공 | 사용 | - |
| Tenzing Gyalzen Sherpa | Nepal | H-A Worker | 성공 | 사용 | - |
출처·참고문헌
http://www.alpenglowexpeditions.com/blog · 2013 · 웹사이트 (5) ·