한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Reinhard Patscheider Annapurna 1989

Annapurna I · 1989 · 봄 (1) · Italy

원정 개요

BC at Messner BC site
C1 at beginning of NW Face
High point at C1.

Everyday snow, wind storm and cold. Went to C1 but did not sleep in tent he pitched there on 24th April. Because of heavy snowfall, had fixed 20m rope and came down to BC same day. Had to stay in BC 5 days because of storm, falling stones and many snow avalanches which came through C1 and broke tent.

30th April returned to C1 on first possible day and found tent broken, so down to BC. Tried to fly by parapente but blown only 1 minute and wind caused crash landing at 5000m (same place where had been on 23rd and had successful parapented to BC with same wind problem that closed but again opened parapente). Shoulder dislocated in crash landing. He relocated shoulder against rock and reached BC after 5:00 pm in beginning snowstorm. 3 or 4 May up to C1 to bring down gear there. In descent one piton came out from face and he fell 15m from 4800m and bruised his back. Cook had came part of the way to help bring down the gear and they came slowly down together to BC (but cook not helping Patscheider to descend).

  • 내부 원정 ID796
  • 원본 EXPIDANN189102
  • 대장Reinhard Patscheider
  • 루트 (Route)NW Face
  • 최고 도달고도5200m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유질병 (7)

참가자 2명

이름국적역할정상 등정산소사망
Reinhard PatscheiderItalyLeader---
Helga SeilerW GermanyMember---

출처·참고문헌

Hawley, Elizabeth · 1989 · 학술지·저널 (2) · AAJ
· 1989 · 잡지 (3) · MM
http://publications.americanalpineclub.org/articles/12199024802/Asia-Nepal-Annapurna-Solo-Attempt · 1989 · 웹사이트 (5) ·