한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Kharkov Club Expedition

Ama Dablam · 2013 · 봄 (1) · Ukraine

원정 개요

On 13th of April, all 7 team members slept in C1.

On 14th of April, Sukhyna and Sydorenko climbed almost to C2 with light bags to check the quality of the route and came back to C1. (Same day Mamin had some sort of throat infection and stayed at C1 for rest with the remnant of the team.)

On 15th of April, the same pair started with heavy bags (12.5 kgs) to put in C2. During the night the snow and ground became slippery, difficult to progress. After one hour, Dis and Prokhorov started as well with some heavy bags for C2. At 5800m both decided to turn back because of the difficult ground; as Sukhyna and Sydorenko heard by radio with C1 that their teammates decided to turn back, they knew they had no chance to continue up. Then came back to C1 as well (high point at 6000m that day).

On 16th of April the team decided the day before to stop the expedition and begun to climb down, Mamin persuaded Sukhyna and Sydorenko to climb up again "to see the route." After 3 to 4 hours of climbing, the trio went up to 6000m and turned back for C1, packed everything there and left directly for base camp, then Ama Dablam Garden Lodge, 3800m.

  • 내부 원정 ID7951
  • 원본 EXPIDAMAD13102
  • 대장Sergiy Sukhyna
  • 루트 (Route)SW Ridge
  • 최고 도달고도6000m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 7명

이름국적역할정상 등정산소사망
Sergiy SukhynaUkraineLeader---
Vadim DisUkraineClimber---
Evgeny FederovRussiaClimber---
Pavel KoveshnikovRussiaClimber---
Vladymyr MaminUkraineClimber---
Oleksander ProkhorovUkraineClimber---
Pavlo SydorenkoUkraineClimber---

출처·참고문헌

연결된 원본 Reference가 없습니다.