한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Adventure Peaks Baruntse Expedition 2012

Baruntse · 2012 · 가을 (3) · UK

원정 개요

Summit day 5/11/2012: all the team except Cornelis Hermanus started at 2:30 am (Cornelis went to visit C2 and stayed at C1 for sleeping, but decided not to attempt the summit (lack of experience for mountaineering).

Herbert Luethi arrived first on top at 8:30 am with Dorji Sherpa and went back to base camp at 2 pm. Samuel Lipscombe arrived on top at 9:30 am with Roshan Bhattarai. Then Noble, Mills and Bracq with Phur Lhakpa Sherpa. The six of them went back to C2 the same day and slept there (arrival there about mid-afternoon), then went back to the base the day after.

Sherpas:
Phur Lhakpa Sherpa, (2049/2/10) 23 May 1992, Bung-9, Solukhumbu
Ngang Dorje Sherpa, (2048/7/17) 3 Nov 1991, Tamku-5, Sankhuwasabha
Roshan (Dipen) Bhattarai (2041/11/05), 16 Feb 1985, Hangdewa-6, Taplejung

  • 내부 원정 ID7798
  • 원본 EXPIDBARU12303
  • 대장Paul Noble
  • 루트 (Route)SE Ridge
  • 최고 도달고도7152m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 9명

이름국적역할정상 등정산소사망
Paul NobleUKLeader성공--
Florence Helene Gabrielle BracqFranceClimber성공--
Samuel John Watson LipscombeUKClimber성공--
Herbert LuethiSwitzerlandClimber성공--
Anthony David (Tony) MillsUKClimber성공--
Cornelis Hermanns Van BerbelNetherlandsClimber---
Roshan (Dipen) BhattaraiNepalH-A Worker성공--
Ngang Dorje SherpaNepalH-A Worker성공--
Phur Lhakpa SherpaNepalH-A Worker성공--

출처·참고문헌

http://www.samlipscombe.com/baruntse/timeline/ · 2012 · 웹사이트 (5) ·