한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Chinese Makalu Expedition

Makalu · 2012 · 봄 (1) · China

원정 개요

BC 14 Apr 4870m
ABC 16 Apr 5700m
C1 02 May 6400m
C2 03 May 6700m
C3 10 May 7400m
Smt 11 May Wang and Tashi Tshering (10 am), Yongzhong and Ang Du (11 am)
and Liang and Lhakpa Dendi (12"30 pm).

Team left C3 at 6 pm. The weather was good and the conditions on the moutain very dry, which made it difficult to climb. Wang took 18 hours to reach the summit. Liu Yong-Zhong 19 hours and Liang 20-1/2 hours. They spent about 10 minutes on the summit. They descended to C3, where Wang arrived at 1:35 pm (11 May), Yong-Zhong arrived at 10:30 pm (11 May) and Zhang Liang at 12:30 am on 12th May.

The reason why Zhang Liang and Yong-Zhong arrived at C3 so late was that they were caught in a storm and had trouble finding the camp. Wang was about 2 hours ahead of them and the storm started about 15 minutes before she reached C3. They took almost 10 hours to get back.

The following day everyone descended to BC on the 13 May they took a helicopter to Kathmandu.

Oxygen:
Taken and used C3 to summit to C3 by all members.
C4 to summit to C4 by Sherpas.

Sherpas:
Tashi Tshering (Tashi Chhiring), Khumjung, Khumbu, 8/5/1990
Everest 21/5/2009
Everest 22/5/2010
Manaslu 1/10/2010

Lhakpa Dendi, Gudel-9, Solukhumbu, 22/11/1974
Makalu 18/5/2008 UK (David Tait)

Angdu (Gaurishankar-3, Dolakha) 10/09/1979
Makalu 23/05/2010 France (Alexia Zuberer)

  • 내부 원정 ID7594
  • 원본 EXPIDMAKA12101
  • 대장Wang Jing
  • 루트 (Route)Makalu La-NW Ridge
  • 최고 도달고도8485m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 6명

이름국적역할정상 등정산소사망
Jing WangChinaLeader성공사용-
Yong-Zhong LiuChinaClimber성공사용-
Liang ZhangChinaClimber성공사용-
Angdu SherpaNepalH-A Worker성공사용-
Lakpa Dendi SherpaNepalH-A Worker성공사용-
Tashi Chhiring (Tashi Tshering) SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.