Himlung Expedition
Himlung Himal · 2011 · 봄 (1) · Switzerland
원정 개요
BC at 4900m at Gyajikang BC.
Approach: Jomsom, Chaile, Sera Gomba, Lo Manthang, Yara Thanti, Labse Khola, Damodar Kund, Japanese BC, Saribung, high camp, Bhrikuti, Phugaon
On 21 May three members including leader Wellig and four Nepalese left C2 at 2 am for the summit. They reached summit at 12 noon, stayed on summit for 30 minutes, then descended to C1 at 4 pm and slept there. Next day went down to BC.
Fixed rope: 200m from 6250-6350m
Hired:
Ngima Dorje Tamang, 30 May 1981 (17/2/2038), Tapting-7
Lal Bahadur Tamang, 21 June 1983 (07/03/2040), Ramche-6, Rasuwa
Kancha Lama Sherpa, 19 Nov 1982 (04/08/2039), Taksindu-2, Solu
Temba Sherpa, 15 Apr 1987 (02/01/2044), Lelep-9, Taplejung
BC at 4900m at Gyajikang BC.
- 내부 원정 ID7369
- 원본 EXPIDHIML11101
- 대장Diego Wellig
- 루트 (Route)SW Ridge
- 최고 도달고도7126m
- 정상 등정 성공예
- 산소 사용미사용·확인 필요
- 종료 사유정상 등정 성공 (1)
참가자 7명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Diego Wellig | Switzerland | Leader | 성공 | - | - |
| Dierk Maass | Switzerland | Climber | 성공 | - | - |
| Michael (Michi) Nellen | Switzerland | Climber | 성공 | - | - |
| Kanchha Lama Sherpa | Nepal | H-A Worker | 성공 | - | - |
| Tembe/Temba Sherpa | Nepal | H-A Worker | 성공 | - | - |
| Lal Bahadur Tamang | Nepal | H-A Worker | 성공 | - | - |
| Nima Dorje (Saila) Tamang | Nepal | H-A Worker | 성공 | - | - |