한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Himlung Expedition

Himlung Himal · 2011 · 봄 (1) · Switzerland

원정 개요

BC at 4900m at Gyajikang BC.

Approach: Jomsom, Chaile, Sera Gomba, Lo Manthang, Yara Thanti, Labse Khola, Damodar Kund, Japanese BC, Saribung, high camp, Bhrikuti, Phugaon

On 21 May three members including leader Wellig and four Nepalese left C2 at 2 am for the summit. They reached summit at 12 noon, stayed on summit for 30 minutes, then descended to C1 at 4 pm and slept there. Next day went down to BC.

Fixed rope: 200m from 6250-6350m

Hired:
Ngima Dorje Tamang, 30 May 1981 (17/2/2038), Tapting-7
Lal Bahadur Tamang, 21 June 1983 (07/03/2040), Ramche-6, Rasuwa
Kancha Lama Sherpa, 19 Nov 1982 (04/08/2039), Taksindu-2, Solu
Temba Sherpa, 15 Apr 1987 (02/01/2044), Lelep-9, Taplejung

BC at 4900m at Gyajikang BC.

  • 내부 원정 ID7369
  • 원본 EXPIDHIML11101
  • 대장Diego Wellig
  • 루트 (Route)SW Ridge
  • 최고 도달고도7126m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 7명

이름국적역할정상 등정산소사망
Diego WelligSwitzerlandLeader성공--
Dierk MaassSwitzerlandClimber성공--
Michael (Michi) NellenSwitzerlandClimber성공--
Kanchha Lama SherpaNepalH-A Worker성공--
Tembe/Temba SherpaNepalH-A Worker성공--
Lal Bahadur TamangNepalH-A Worker성공--
Nima Dorje (Saila) TamangNepalH-A Worker성공--

출처·참고문헌

연결된 원본 Reference가 없습니다.