한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Extreme Adventure Everest Expedition

Everest · 2011 · 봄 (1) · Brazil

원정 개요

On summit bid of the Coelho team along with four Sherpas, the team reached C2 on 15 May. Ferrari suffered from leg (right) infection at C2. Then the team decided to abort the expedition and went down to BC. On 20 May Ferrari and Coelhos left BC in a helicopter.


Email from Helena Coelho:

Again we went to Everest! But it was not supposed to attempt to go to summit. Me and Paulo were there for giving support to a client; Paulo was supposed to be a cameraman up to C2 or C3 and me only to organize the base camp and assist him in the period of acclimatization. We also had the permit paid by the client only in any emergency he needed a help.

He would try the summit with Sherpas and with oxygen and we should wait for him in C2 or C3. It was that!

He couldn't attempt to go to summit because he had serious health problem on the way to C3, so we had to come down with him from C2 (6400m) to base camp and from there (base camp) he was rescued by helicopter. And all of us came back to Kathmandu on 21 May.

Sherpas:
Phurba Namgyal, 7/2/86, Beding, Everest X2, Cho Oyu X2
Angdu Sherpa, 10/9/79, Gaurishankar-3, Makalu X1
Chiring Finjo, 18/5/85 (5/2/2042), Langtang-3
Pemba Rita, 31/8/79, Beding, Cho Oyu X2, Everest X5

  • 내부 원정 ID7364
  • 원본 EXPIDEVER11190
  • 대장Paulo Coelho
  • 루트 (Route)S Col-SE Ridge
  • 최고 도달고도7300m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유질병 (7)

참가자 7명

이름국적역할정상 등정산소사망
Paulo Rogerio Pinto CoelhoBrazilLeader---
Cid Filho Ferrari VinhateBrazilClimber---
Helena Guiro Pacheco Pinto CoelhoBrazilClimber---
Angdu SherpaNepalH-A Worker---
Chhiring Finjo SherpaNepalH-A Worker---
Pemba Rita SherpaNepalH-A Worker---
Phurba Namgyal SherpaNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.