한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Swiss & American to Everest

Everest · 2011 · 봄 (1) · Switzerland

원정 개요

Bernhard and Lhakpa Gelu left Camp 2.5 (7900m) at 8 pm on 19 May towards the summit. When they arrived at 8600m at about 4:45 am NST on 20 May, at that point Lhakpa Gelu told Bernhard that they have to stop there as weather is getting bad and they will not have enough time to go to the summit and to return in time because there were many climbers ahead of them. While turning back indeed cloud started covering the ridge and became white-out. They reached Camp 2.5 around 6:30 am and it was difficult to get there.

Keogh left (BC) expedition on 29 April as his hands were getting very cold and also had low grade fever associated with dry cough.

  • 내부 원정 ID7358
  • 원본 EXPIDEVER11180
  • 대장Urs Bernhard
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8600m
  • 정상 등정 성공아니오
  • 산소 사용사용
  • 종료 사유악천후 (4)

참가자 3명

이름국적역할정상 등정산소사망
Urs BernhardSwitzerlandLeader-사용-
James Christopher KeoghUSAClimber---
Lhakpa Gelu SherpaNepalH-A Worker-사용-

출처·참고문헌

http://www.ubernhard.com/quest_for_the_seven_summits.htm · 2011 · 웹사이트 (5) ·