한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

American Baruntse Expedition

Baruntse · 1988 · 봄 (1) · USA

원정 개요

BC at Hillary BC above Barun Pokhari (same as Batard's West pillar BC this spring)
C1 just below Makalu BC's on glaciers juncture
C2 east of point 6220m at glacier
C3 below some icefalls (south of ridge running east of point 6667m)
C4 just below col
High point on ridge above Col.

Had problems getting loads up rock glacier and had several intermediate camps in this process. On 7th May got at 80-degree ice above C4, then mostly ice with snow over loose rocks where found thick blue fixed rope (mostly buried) from earlier expedition. Again difficult steep ice and now saw were well below where steepness eased off and gave up. Had fixed then only available ropes and not enough rope now to fix route above or enough time to climb without it.

  • 내부 원정 ID71
  • 원본 EXPIDBARU88102
  • 대장James Brug
  • 루트 (Route)N Ridge from E
  • 최고 도달고도6500m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유시간 부족 (9)

참가자 7명

이름국적역할정상 등정산소사망
James BrugUSALeader---
Thomas CreightonUSAClimber---
Sarah ElsonUSAClimber---
Julia (Lia) LoomisUSAClimber---
Lucy LoomisUSAExp Doctor---
Howard Case RunyonUSAClimber---
Dendi SherpaNepalSirdar---

출처·참고문헌

Brug, James · 1988 · 학술지·저널 (2) · AAJ
Photograph of route
http://publications.americanalpineclub.org/articles/12198919203/Asia-Nepal-Baruntse-North-Ridge-Attempt · 1988 · 웹사이트 (5) ·