Baruntse 2010
Baruntse · 2010 · 가을 (3) · Italy
원정 개요
BC near lake
C1 just over West Col
High point at site for C2.
On their way to Baruntse BC, the entire team scaled Mera Peak on 21 Oct to acclimatize.
On 28 October, Rubito and Pemba Ongchu climbed from C1 to the site for their C2 at 6450m at the base of the SE Ridge and then rejoined other members in C1, and all descended to BC the same day.
They decided to abandon the climb that day. Other teams had not been able to get across a big crevasse on the ridge, there was a lot of snow on the mountain, and members were not in good condition.
Sherpa:
Pemba Ongchu, 2/10/83, Kharikhola, Lhotse 23/5/10
- 내부 원정 ID6929
- 원본 EXPIDBARU10303
- 대장Sergio Zigliotto
- 루트 (Route)SE Ridge
- 최고 도달고도6450m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유산악 상태 (5)
참가자 9명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Sergio Zigliotto | Italy | Leader | - | - | - |
| Daniela Brazzale | Italy | Climber | - | - | - |
| Davide Chiesa | Italy | Climber | - | - | - |
| Enrico Dorantani | Italy | Climber | - | - | - |
| Corrado Perissinotti | Italy | Climber | - | - | - |
| Massimo Rabito | Italy | Climber | - | - | - |
| Tania Ratini | Italy | Climber | - | - | - |
| Roberto Riflessi | Italy | Climber | - | - | - |
| Pemba Ongchu (Pemba Wangchu) Sherpa | Nepal | H-A Worker | - | - | - |
출처·참고문헌
연결된 원본 Reference가 없습니다.