한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

German-Russian IV Autumn Expedition

Annapurna IV · 2010 · 가을 (3) · Germany

원정 개요

On 14 Oct team started opening route and fixing ropes from BC to 100m below C1. The first leg from BC to C1 was mixed technical climbing and there was vertical rock face about 30-40 meters. Then the team descended to BC. On 20 Oct the team went up to 5500m close to C1. There was a very narrow ridge to pass before reaching C1. Both sides of the ridge were steep and with snow on top of the narrow ridge it was dangerous to cross it. There was danger of breaking the snow on the ridge if someone stepped on it. Then the team decided to return to BC. On 21 and 22 Oct snowstorm started. On 23 and 24 Oct there were avalanches. There was not enough time to wait for weather to improve. Then the team decided to abandon the expedition.

Fixed rope: BC to C1.

BC GPS reading: N28 degrees.35'.05,1" E.084,04 degrees - 50.9"

  • 내부 원정 ID6880
  • 원본 EXPIDANN410301
  • 대장Wolfgang Seeliger
  • 루트 (Route)NW Ridge
  • 최고 도달고도5500m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 3명

이름국적역할정상 등정산소사망
Wolfgang SeeligerGermanyLeader---
Nadezda (Nadja) SeeligerRussiaClimber---
Mitenjen (Mingma) SherpaNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.