French Expedition to Langtang Lirung
Langtang Lirung · 1990 · 가을 (3) · France
원정 개요
BC at Tsangbu yak hut at SW end of Langtang Glacier
ABC further up glacier moraine at start of snow
C1 on SE Ridge (space only for 1 small tent for 2 people)
C2 on SE Ridge (at end of difficult rock part)
High point at C2.
Took time to fix ropes in gully to SE Ridge for C1 and also was snowfall and members had stomach trouble. In some parts of gully 1 meter snow (at BC about 30 cm snow). Beginning of difficulties began just above ABC at 5000m; had not realized before that couloir in so steep (55 degrees, not 45 degrees) and required fixed rope for descent. Thus ran out of rope for fixing above C2. In any case ran out of this; fixed about 1000m of rope (some from France, some bought in Langtang and rest old ropes on mountain). Were too slow in couloir and above in difficult rock and ice. Need one week more and perhaps 1-2 more members (technically difficult for Sherpas).
Ridge itself is safe but BC and ABC exposed to avalanches from couloir. After snowfall there was lot of snow moving down couloir but no big avalanches.
- 내부 원정 ID675
- 원본 EXPIDLANG90301
- 대장Serge Bazin
- 루트 (Route)SE Ridge
- 최고 도달고도6100m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유보급·장비 (8)
참가자 7명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Serge Bernard Bazin | France | Leader | - | - | - |
| Michel Soulie | France | Deputy Leader | - | - | - |
| Jean-Louis Delourme | France | Climber | - | - | - |
| Valerie Mathieu | France | Climber | - | - | - |
| Daniel Murro | France | Climber | - | - | - |
| Christian Oriol | France | Climber | - | - | - |
| Philippe Oriol | France | Climber | - | - | - |