2009 Punchen Himal Expedition
Punchen Himal · 2009 · 가을 (3) · Japan
원정 개요
BC at Syar Khola
C1 at Yangdi Khola
C2 east of Yangdol
High point at beginning of rock.
The team made two bids to reach the summit. The first one was on 4 October by Shigemori and Tanaka, plus Pasang Tamang and Dhan Kumar Tamang. They left C2 for the top at 4:00 am, moving up the snow ridge to 5888m, where the final section of the route led up difficult bare rock. Here they stopped, turned around and descended to C1. The two members returned to BC the next day.
The other three members, brothers Akira and Koichi Kato and Isie, and the same two Tamangs (who came up from C1) left C2 on 5 October at 7:00 am, and they in turn stopped at 5888m, at 12 noon. They went down to BC on the same day. The climb was over.
Tamangs:
Dhan Kumar, 4/12/85 (19/8/2042), Deusa, Solu, no 8000ers
Pasang, 4/12/68, Deusa, Solu, Everest X3
- 내부 원정 ID6693
- 원본 EXPIDPUCH09301
- 대장Koichi Kato
- 루트 (Route)SSW Ridge
- 최고 도달고도5888m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유기술적 난이도 (10)
참가자 7명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Koichi Kato | Japan | Leader | - | - | - |
| Fumio Isie | Japan | Climber | - | - | - |
| Akira Kato | Japan | Climber | - | - | - |
| Shuzo Shigemori | Japan | Climber | - | - | - |
| Toshiaki Tanaka | Japan | Climber | - | - | - |
| Dhan Kumar Tamang | Nepal | H-A Worker | - | - | - |
| Pasang Tamang | Nepal | H-A Worker | - | - | - |