한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Kanagawa University Alpine Club Everest Expedition

Everest · 2009 · 봄 (1) · Japan

원정 개요

Summit team left C3 at midnight. It was windy and it was snowing. They spent 1/2 hour on summit, then descended to C3, arrived at 5 pm.

Hizume, Nishida, Ogasawara, Sakuta and Watanabe only reached ABC. All of them were stricken by flu and diarrhea.

Kikuchi reached C1 on 30 April, stayed 1 night, abandoned climb due to bowel problems.

Tachikawa reached 6800m on 30 April, abandoned climb due to feeling ill (flu).

Ochiai reached 8500m on 18 May just below 2nd Step. He felt that his feet were very cold and descended to C3, where he noticed slight frostbite on both his feet.

Ito never intended to climb. He remained at BC as the expedition doctor.

Sherpas:
Wangchu Sherpa, Phurte/Thamiteng, Khumbu, 20/11/1967, Everest 2007 & 2008
Phur Gyalzen, Thami, Khumbu, 16/4/70, Everest 2003, 2005, 2008
Lhakpa Nuru, Pare, Khumbu, 3/10/60, Cho Oyu X2

  • 내부 원정 ID6412
  • 원본 EXPIDEVER09146
  • 대장Masaji Ochiai
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 14명

이름국적역할정상 등정산소사망
Masaji OchiaiJapanLeader-사용-
Junro HizumeJapanClimber---
Takeshi ItoJapanExp Doctor---
Minoru KikuchiJapanClimber---
Kenta MiyamoriJapanClimber성공사용-
Tateru NishidaJapanClimber---
Tatsuo OgasawaraJapanClimber---
Yoshio SakutaJapanClimber---
Toshihiko TachikawaJapanClimber---
Yasunori TanakaJapanClimber성공사용-
Satoru WatanabeJapanClimber---
Lhakpa Nuru SherpaNepalH-A Worker성공사용-
Phur Gyalzen (Fur Geljen) SherpaNepalH-A Worker성공사용-
Wangchu SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.