한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Atunas Taiwanese 7 Summits Everest

Everest · 2009 · 봄 (1) · Taiwan

원정 개요

Summit team left C4 at 10 pm. Weather was calm and clear. Very busy, about 40 minutes wait at Hillary Step. They spend 20 minutes on summit, then descended to C4, arrived at 3 pm. On 20 May to C2; on 21 May to BC.

Hsieh reached C3 on 13 May, stayed 1 night for acclimatization when team returned to BC. He caught a cold. On summit push he reached C2, but returned to BC as he was not feeling well.

Sherpas:
Tshering Thundu Sherpa, Khumjung, Khumbu, 4/10/74 (18/6/2031),
Everest 2007 & 2004 with Dream Everest, Cho Oyu X1
Phura Nuru, Tesho, Namche-5, 28/6/85, Everest X1
Ngima Nuru, Tesho, Namche-5, 6/11/81, Everest X9, Cho Oyu X1

  • 내부 원정 ID6393
  • 원본 EXPIDEVER09126
  • 대장Wu Yu-Lung
  • 루트 (Route)S Col-SE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 7명

이름국적역할정상 등정산소사망
Yu-Lung WuTaiwanLeader성공사용-
Hsiu-Chen (Ann) ChiangTaiwanClimber성공사용-
Yin-Shu HsiehTaiwanClimber---
Jyh-How HuangTaiwanClimber성공사용-
Ngima Nuru (Nima Nuru) SherpaNepalH-A Worker성공사용-
Phura Nuru SherpaNepalH-A Worker성공사용-
Tshering Thundu SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.