한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Azpeitia Everest 1991

Everest · 1991 · 가을 (3) · Spain

원정 개요

C3 on Lhotse Face
C4 at South Col (occupied 2nd Oct)
High point at South Summit.

Pitched C4 29 Sept and down same day to C2 for 2-3 days rest. Up to C4 on 2 Oct. 3rd Oct C4 to South Summit, where Irureta's oxygen finished. Left C4 2 am, arrived S Summit 11:30 am, now problem with Irureta's O2 regulator and Valencia summit party decided to turn back here (had left C4 earlier than Basques) so both Basques also turned back: Bereziartua could not go on up the Hillary Step alone in snow on route and techinical difficulty. Back to C4 and down to BC where all members and Sherpas are now on 4th Oct.

7 Oct 5 members and 4 Sherpas up to C2; 8th too much wind. Oct 9th to C3, wind and again to C2 (wind blowing snow). 13th Oct finally all down from C2 to BC and climb finished. Left BC 14th Oct.

  • 내부 원정 ID610
  • 원본 EXPIDEVER91305
  • 대장Josu Bereziartua
  • 루트 (Route)S Col-SE Ridge
  • 최고 도달고도8750m
  • 정상 등정 성공아니오
  • 산소 사용사용
  • 종료 사유보급·장비 (8)

참가자 8명

이름국적역할정상 등정산소사망
Jesus Maria (Josu) Bereziartua EtxanizSpainLeader-사용-
Pedro Aranbarri SegurolaSpainClimber---
Pedro Maria (Pello) Aranburu OiarizabalSpainClimber---
Amaia Aranzabal EzpeletaSpainClimber---
Josu Arrieta AzpiazuSpainClimber---
Benantxio Irureta AguirreSpainClimber-사용-
Gurutz Larranaga LesacaSpainClimber---
Jose-Takolo Urbieta CendoyaSpainClimber---

출처·참고문헌

Hawley, Elizabeth · 1991 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12199220502/Asia-Nepal-Everest-South-Col-Post-Monsoon-Attempts · 1991 · 웹사이트 (5) ·