한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Thulagi Peak Expedition of Osaka Alpine Club 2008

Thulagi · 2008 · 봄 (1) · Japan

원정 개요

BC at junction of Dudh Khola and Kasongtu Khola
High point on NW Face [of plateau] by Taniguchi, Okada & Nakajima.

Thulagi Peak Expedition of Osaka Alpine Club 2008 Spring, led by Tamotsu Ohnishi

Between C1 and C2 the expedition placed a camp they called Relay Camp because of the long distance between the two camps on a difficult rock ridge and ice face.

They abandoned their climb on 3 May because the terrain was difficult, and when they tried on 3 May to climb higher than 6250m, they were forced to give up the idea because 20 avalanches were falling frequently from the plateau at 6400m where they had planned to pitch C3.

Their only health problem was the altitude sickness which 76-year-old Nishikawa got at about 4000m when he was trying to reach ABC in late April. He was all right when he had returned to BC.

Sherpas:
Chhepa Sherpa, 29/10/83, Sotang-6, Solu, no 8000ers
Pasang Kaji Sherpa, 24/2/81, Sotang, Solu, Cho Oyu 4/10/07
Tul Bahadur Tamang, 30/8/66, Deusa, Solu, Everest X2, Cho Oyu X2, Dhaulagiri X1,
Manaslu X1

  • 내부 원정 ID6098
  • 원본 EXPIDTHUL08101
  • 대장Tamotsu Ohnishi
  • 루트 (Route)NW Face-NW Ridge
  • 최고 도달고도6250m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유악천후 (4)

참가자 12명

이름국적역할정상 등정산소사망
Tamotsu OhnishiJapanLeader---
Kohji KobayashiJapanClimber---
Kenro NakajimaJapanClimber---
Hiroshi NakamuraJapanClimber---
Motoo NishikawaJapanBC Manager---
Hisako NogiJapanClimber---
Yuko OkadaJapanClimber---
Mamoru TaniguchiJapanClimber---
Emiko TatsumiJapanClimber---
Chhepa SherpaNepalH-A Worker---
Pasang Kaji SherpaNepalH-A Worker---
Tul Bahadur TamangNepalH-A Worker---

출처·참고문헌

Nakajima, Kenro · 2008 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12200932702/Asia-Nepal-Thulagi-7059m-Attempt · 2008 · 웹사이트 (5) ·