한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

G-Tohan (Ascent) Club Everest Expedition 1991

Everest · 1991 · 가을 (3) · Japan

원정 개요

C2 in Western Cwm
C3 on Lhotse Face
C4 at South Col
High point at South Summit.

30th Sept Sherpas pitched C4 but camp not slept in till 1st Oct. Sherpas go very quickly but Japanese members very slow.

1st summit attack from col 1/2 Oct and Nakajima reached 8500m, Iwazoe to 8250m and Sherpas Phinzo and Nawang Choklang to 8500m. Iwazoe back because carrying 2 oxygen bottles and they were very heavy; other turned back because snow very soft and deep (at 8500m at 3 am) and sirdar said when sun comes avalanches will start.

2nd summit attack from C4 on 5 Oct by Ono and Phinzo: started 6:30 am, reached S Summit 2 pm, then down because oxygen finished.

No more attacks; 3rd attack for summit planned but when Sherpas reached C4, they found tent broken by winds.

All members reached C3. Left BC 12 Oct.

  • 내부 원정 ID606
  • 원본 EXPIDEVER91309
  • 대장Yasuo Iwazoe
  • 루트 (Route)S Col-SE Ridge
  • 최고 도달고도8750m
  • 정상 등정 성공아니오
  • 산소 사용사용
  • 종료 사유보급·장비 (8)

참가자 10명

이름국적역할정상 등정산소사망
Yasuo IwazoeJapanLeader-사용-
Fumiaki HayakawaJapanClimber---
Keisuke KawamuraJapanClimber---
Akira NakajimaJapanClimber-사용-
Shozo OnoJapanClimber-사용-
Aogu SumikawaJapanClimber---
Masayuki SuzukiJapanClimber---
Ryoji YamadaJapanClimber---
Nawang Choklang SherpaNepalSirdar-사용-
Phinzo SherpaNepalH-A Worker-사용-

출처·참고문헌

Hawley, Elizabeth · 1991 · 학술지·저널 (2) · AAJ
· 1991 · 잡지 (3) · IWA
· 1991 · 잡지 (3) · IWA
http://publications.americanalpineclub.org/articles/12199220502/Asia-Nepal-Everest-South-Col-Post-Monsoon-Attempts · 1991 · 웹사이트 (5) ·