한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Himlung 2008 Expedition

Himlung Himal · 2008 · 봄 (1) · Germany

원정 개요

C3 not the usual C3 site; the usual C3 site is 6300m and further below from the C3 the team put up its camp.

The team was proceeding to C3 from C2 at 6700m where the team reached around 3 pm. Found big crevasse blocking the route; it was foggy day and could not figure out the condition of crevasse. The team turned around to 6600m and camped for the night. Considering the rapid deterioration of the weather (fog with less than 50 inches visibility and snowfall), the team decided against further exploration of the situation. The team abandoned the climb and returned to Kathmandu on 20 May and will leave on 23rd.

Fixed rope: 100m between C1 to C2.

Hired:
Pemba Tamang, 31/5/73 (18/2/2030), Taksindu-3, Manaslu 20/5/06

  • 내부 원정 ID6030
  • 원본 EXPIDHIML08102
  • 대장Wolfgang Seeliger
  • 루트 (Route)SW Ridge
  • 최고 도달고도6700m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유악천후 (4)

참가자 5명

이름국적역할정상 등정산소사망
Wolfgang SeeligerGermanyLeader---
Bernd HallexGermanyClimber---
Peter HeringGermanyClimber---
Nadezda (Nadja) SeeligerRussiaClimber---
Pemba TamangNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.