Tukuche Expedition
Tukuche · 2007 · 가을 (3) · Austria
원정 개요
Riglthaler, Wagner, Winkler and Puchang Bhote left on 27 Oct C1 at 3 am. Winkler and Puchang Bhote reached summit at 11 am, stayed on summit about about 45 minutes, then descended to C1 at 2 pm. Then continued to BC at 4 pm. Weather was very good, no clouds, little wind from west. Riglthaler and Wagner had to return from 6300m around 7 am; They fell down several times during their climb as they were climbing without walking poles so they became tired and gave up climbing. Riglthaler and Wagner reached BC around 12 pm.
Ollmann suffered from headache at BC and remained there.
The team returned Kathmandu on 3 Nov and will leave on 7 Nov.
Hired:
Puchhong Bhote, 2/4/80 (2036/12/20), Chepuwa-3, Sankhuwasabha
- 내부 원정 ID5914
- 원본 EXPIDTUKU07301
- 대장Johann Winkler
- 루트 (Route)NE Ridge
- 최고 도달고도6920m
- 정상 등정 성공예
- 산소 사용미사용·확인 필요
- 종료 사유정상 등정 성공 (1)
참가자 5명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Johann Winkler | Austria | Leader | 성공 | - | - |
| Herbert Ollmann | Austria | Climber | - | - | - |
| Silvester Riglthaler | Austria | Climber | - | - | - |
| Karl Wagner | Austria | Climber | - | - | - |
| Phuchhanga (Puchhang) Bhote | Nepal | H-A Worker | 성공 | - | - |