한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Amical Alpin Dhaulagiri I Expedition 2007

Dhaulagiri I · 2007 · 가을 (3) · Austria

원정 개요

On 19 Sept Van Hoek left C2 at 8 am on 19 Sept. He went on his own as rest of team decided that they should go down as it was acclimatization trip. He stopped at 6950m where Japanese fixed line stopped. He descended to C2, where Klerkx, Neuschmid and Nousig were waiting. They descended to BC together. The weather was good on 19 Sept. On 20 Sept it started snowing and did not stop for 6 days.

On 29 Sept Van Hoek, Klerkx, Neuschmid and Nousig ascended to C1 and stayed for 3 nights. During that period the weather was unstable and attempts to reach C2 failed due to avalanche danger and bad weather. On 1 Oct they descended to BC. They dismantled camp and took their gear down. They never tried another summit push due to the bad weather.

Scheiber got to BC on 10 Sept. He had a flu and descended to Marpha on 11 Sept. He never went back to BC but returned to Kathmandu.

Wieser did not feel well and turned back on way to BC on 10 Sept. He wanted to go to Marpha and get rid of his cold but never returned to BC.

  • 내부 원정 ID5879
  • 원본 EXPIDDHA107307
  • 대장Andreas Neuschmid
  • 루트 (Route)NE Ridge
  • 최고 도달고도6950m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 6명

이름국적역할정상 등정산소사망
Andreas NeuschmidAustriaLeader---
Edwin KlerkxNetherlandsClimber---
Lorenz NoesigAustriaClimber---
Konrad ScheiberAustriaClimber---
Tomas Van HoekNetherlandsClimber---
Karl WieserAustriaClimber---

출처·참고문헌

연결된 원본 Reference가 없습니다.