한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Slovakia & Poland to Dhaulagiri

Dhaulagiri I · 2007 · 가을 (3) · Slovakia

원정 개요

High point at 8076m false summit on NE Ridge.

Both left BC for summit push 10 Oct; in C1 stayed 2 nights because of snowfall; C2 on 12th; C3 on 13th. 14th left C3 at 10:45 am and at 11:30 am reached false summit on ridge with pole. Started snowing and wind blowing, so down to C3. Next day down from BC, but weather prevented reaching BC so bivouaced at 5360m at 6:00-7:00 pm. 16th at BC 5:00 pm. No snow at BC on arrival, 1.60 m on departure. Avalanching between BC and C1, but not hit, only pressure felt.

  • 내부 원정 ID5876
  • 원본 EXPIDDHA107304
  • 대장Josef Kopold
  • 루트 (Route)NE Ridge
  • 최고 도달고도8076m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 2명

이름국적역할정상 등정산소사망
Josef (Dodo) KopoldSlovakiaLeader---
Kinga BaranowskaPolandClimber---

출처·참고문헌

연결된 원본 Reference가 없습니다.