한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Jagged Globe Ama Dablam Expedition 2006

Ama Dablam · 2006 · 가을 (3) · UK

원정 개요

C2 lower than normal site because normal site strewn with ice blocks and remnants of gear, "didn't feel right" to camp where fatal avalanche had hit and this lower site better protected but rather restricted space (only 2 tents with 3 people each in a squeeze).

Summit party of 2nd: left C2 at 8:30 am; Hicks turned back at 6282m (just below old C3) and down to C1; Briggs turned around at 6400m: ran of energy and down to C3. All others in party to top at 1:45 pm (Weight and Tashi) and at 2:15 (Goddard) and C3 at 5:45 and 6:10 pm respectively.

4th Dec summit party of Wheeldon and Pema Tshering left C3 at 6:30 am, arrive top at 10:50 am and in C2 at 6:00 pm (Wheeldon fell 15 m where anchor came out at about 6000m but only bruised). Weight had also fallen 4m into bergschrung at 6350m when put foot into what was actually empty space (also not hurt) on his descent from top but was attached to fixed rope.

This team last on mountain and it was "beautiful."

  • 내부 원정 ID5502
  • 원본 EXPIDAMAD06354
  • 대장Neal Short
  • 루트 (Route)SW Ridge
  • 최고 도달고도6814m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 11명

이름국적역할정상 등정산소사망
Neal James ShortUKLeader---
Thomas Richard BriggsUKDeputy Leader---
Christopher GoddardUKClimber성공--
Ian HicksUKClimber---
Angus MacDonaldUKClimber---
Andreas TimmerNetherlandsClimber---
Arie VreugdenhilNetherlandsClimber---
Hadley Hudson WeightS AfricaClimber성공--
Dean WheeldonAustraliaClimber성공--
Pema Tshering (Pem Chhiri) SherpaNepalH-A Worker성공--
Tashi SherpaNepalH-A Worker성공--

출처·참고문헌

http://www.jagged-globe.co.uk/news/reports_read.html?id=493 · 2006 · 웹사이트 (5) ·