한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Expe Himal A4 - French to Annapurna

Annapurna IV · 1990 · 가을 (3) · France

원정 개요

BC at glacier which feeds Sabje Khola
C1 on snow at top rocks enroute to NW Ridge
C2 below ridge
C3 on NW Ridge
High point at NW Ridge.

29th Oct tried to reach summit but not successful; needed C4 but no plan for such a camp.

Summit bid by 5 members plus Kami Rinzi and Nga Temba Sherpa. Left C3 at 4:30 am, climbed ridge all day but snow conditions bad. Slowly reached 6800m at 3 pm, still long way from summit and getting late so all 7 turned back and were in C3 at 6 pm (dusk). 30th down to BC and left BC 1st Nov. Time alloted climb was only 12 days and needed at least 2 weeks for this mountain.

  • 내부 원정 ID51
  • 원본 EXPIDANN490302
  • 대장Bernard Clement
  • 루트 (Route)NW Ridge
  • 최고 도달고도6800m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 12명

이름국적역할정상 등정산소사망
Bernard ClementFranceLeader---
Chantal BerthelemyFranceClimber---
Jacques DesplanFranceClimber---
Mariette DesplanFranceClimber---
Jean GaillardeFranceClimbing Guide---
Andre MiquelFranceClimber---
Antoine PeralFranceClimber---
Marie Edith PeralFranceClimber---
Dominique SautFranceClimber---
Martine TrifonoffFranceClimber---
Kami Rinzi SherpaNepalH-A Worker---
Nga Temba SherpaNepalH-A Worker---

출처·참고문헌

Hawley, Elizabeth · 1990 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12199123806/Asia-Nepal-Annapurna-IV-Attempts · 1990 · 웹사이트 (5) ·