한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Pumori Serbia 2004

Pumori · 2004 · 가을 (3) · Serbia

원정 개요

BC at usual campsite
C1 at usual campsite on SE Face
C2 on SE Face (on descent)
C3 on SE Face.

Andrejic, Petric and Lhakpa left C3 on 26th at 04:00 hours. When they reached at 7060m at about 11:30 hours, visibility was very poor, cloudy, windy and snow and was very cold. Lhakpa told both climbers to turn back as it was not possible for them to continue due to bad weather conditions. Descent was very slow. They had to sleep in C2, which while ascending they avoided due to possible risk of avalanche. The team arrived in C2 site about 19:30 hours. Still the visibility was very poor. Next day weather remained bad. Then went down to BC.

The team arrived to Lobuche on 28th. On 29th Andrejic and supporting staff Miroslav flown in helicopter to KTM. Petric will arrive KTM on Oct 3. The team will leave KTM on Nov 02.

Sherpa:
Lhakpa Tshering/Chhiring Sherpa, Khumjung, Everest X3, Ama Dablam

  • 내부 원정 ID4724
  • 원본 EXPIDPUMO04304
  • 대장Ilija Andrejic
  • 루트 (Route)SE Face-E Ridge
  • 최고 도달고도7060m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유악천후 (4)

참가자 3명

이름국적역할정상 등정산소사망
Ilija AndrejicSerbiaLeader---
Dragan PetricSerbiaClimber---
Lhakpa Tshering/Chhiring SherpaNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.