한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Everest 2004 Cresta Nord-Est

Everest · 2004 · 봄 (1) · Italy

원정 개요

C1 at North Col.

18th party left C3 at 1:00 am NST 18th and on top at 11:00 am and returned to C3 2:00 pm and stayed there. From C3 to ABC on 19th.

Pompili left C3 midnight of 18th and on top 9:30 am of 19th and back in C3 at 1:00 pm and stayed there. Pompili down to C2 20th and ABC 21st.

Dal Chin left 19th 10:00 pm and on top 7:30 am of 20th and back in C2 at 4:00 pm wind and snowfalling and about visibility; got 6 frostbitten from touching rocks while descending, 2 seriously. Dal Chin to C2 and 22nd ABC.

Canestri stopped 30m short of the summit at 11:00 am (as acknowledged by leader Pompili on EverestNews.com and by email to Liz Hawley) due to her tiredness and increasing weariness.

Oxygen: Tossutti, Canestri and Dawa in C3 to top and in C3. Pompili from C3 to top to 8400m. Dal Cin from C3 to top to C3.


Email from Guiseppe Pompili - 17 Aug 2005

"Alessandra [Cannestri], according to her report, stopped at about 30m altitude below the summit (i.e., 100-150m distance) on the last flat plateau of the ridge just before the last ice serac, due to her tiredness and increasing weariness. The time was about 11:00 am (Nepali time) on 18th May. At the moment, she was with her friend Marco, who had already reached the top together with their Sherpa Dawa and had begun his descent."

  • 내부 원정 ID4584
  • 원본 EXPIDEVER04115
  • 대장Giuseppe Pompili
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 5명

이름국적역할정상 등정산소사망
Giuseppe PompiliItalyLeader성공사용-
Alessandra (Sandra) CanestriItalyClimber-사용-
Adriano Dal CinItalyClimber성공사용-
Marco TossuttiItalyClimber성공사용-
Dawa SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.