한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Italian Annapurna III Expedition

Annapurna III · 2003 · 가을 (3) · Italy

원정 개요

BC at 4000m East Annapurna Glacier's mouth
C1 at 4800m just below major rocks between 2 Glacier
C2 at 5500m at top of rock at start of snow ridge
C3 at 6100m on small shoulder, on snow, at first part of S face proper.

Very difficult mountain because it doesn't gain altitude till about 6000m and very long winding route to get there. Did not climb above a higher camp. Planned to climb a couloir just above C2 to get onto West Ridge. In summit push started from BC on 25th and slept in C2 26th, made C3 on 27th. During night of 27th started snowing so 28th decided to go down to BC and reached there through fog at first part of descent. After 2 days decided too much snow in couloir and avalanche danger so climb finished. 30th up to C3 to bring it and lower camps down.

Maoists collected Rs 1000 per Italian and none for Nepalese.

  • 내부 원정 ID4428
  • 원본 EXPIDANN303302
  • 대장Rudy Buccalla
  • 루트 (Route)W Ridge
  • 최고 도달고도6100m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 4명

이름국적역할정상 등정산소사망
Rudy BuccellaItalyLeader---
Giorgio PassinoItalyClimber---
Pier Paolo Role RomanoItalyClimber---
Dawa Gyalje (Dawa Gyalzen) SherpaNepalH-A Worker---

출처·참고문헌

연결된 원본 Reference가 없습니다.