한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Basque Himlung Himalaya Expedition

Himlung Himal · 2003 · 봄 (1) · Spain

원정 개요

BC at 4850m at grass beside stream on NW of mountain
C1 at 5350m at end/top of one moraine at start of glacier
C2 at 5950m top of glacier
C3 at 6350m NW Face on ledge at base icy summit.

From C3 up hard ice face not technically difficult but dangerous if you slip. Left C3 4:00 pm and on top 12:30 pm and at 5:00 pm in C3 to sleep. 20 April left C3 4:00 pm and on top at 4:00 pm and return C3 at 9:00 pm in dark but had headlamps, slow and tired. Fell into crevasses between C1 and top and each member fell in but not hurt.

Pereda went up to C1 only because of headache and stomach trouble.

  • 내부 원정 ID4323
  • 원본 EXPIDHIML03101
  • 대장Inigo Loyola
  • 루트 (Route)NW Face (same as 2002 Spain autumn)
  • 최고 도달고도7126m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 8명

이름국적역할정상 등정산소사망
Inigo Loyola LarranagaSpainLeader성공--
Andoni EtxezarretaSpainClimber성공--
Mitxel InsaustiSpainClimber성공--
Ramon IturrikastilloSpainClimber성공--
Juan Ramon JodarSpainClimber성공--
Francisco MarquezSpainClimber---
Josu PeredaSpainClimber---
Jose Alejandro Torres MurgiondoSpainClimber---

출처·참고문헌

· 2003 · 잡지 (3) · HIGH
Hawley, Elizabeth · 2003 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12200439402/Asia-Nepal-Peri-Himal-Himlung-Ascent · 2003 · 웹사이트 (5) ·