한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

1989-90 Korean Winter Yalung Kang Expedition

Yalung Kang · 1989 · 겨울 (4) · S Korea

원정 개요

C3 above Great Shelf.

Planned all climing finished 13th Dec but because of cold and wind climbing prolonged. 13th up to 8300m but very strong wind and cold defeated this summit bid and all to C3 except Jin and 2 Sherpas, Ang Dawa Sherpa and Tchiring Thebe Lama to C4. 20th the 3 men 4:30 am started up, 2:30 pm cloudy and windy and worried about returning late but kept going up and reached summit 4:05 pm (if turned back at 2:30 would be dark by time reached C4 anyway - had headlamps). 5 mins rest and photos at top. At 4:14 pm leader at BC talking with sirdar; base and sirdar stopped talking and Kim tried to talk to summit Sherpa but no answer; men in C4 also tried to contact summiter but also received no answer all night. 21st search by men in C4 and C1 but no trace. Probably 3 summiters fell down N Face. No avalanching and could not be seen 21st morning in clear but windy weather. No snowfall during windy night of 20th.

1st summit bid leader and Sherpas used oxygen at and above C4 and other members except Jin used it climbing above C4.

2nd summit bid Jin used oxygen sleeping in C4 and climbing above C4, but Sherpas used it only sleeping.

Kim finds it difficult to accept that Jin is dead, that he is not just late coming back from N Face.

  • 내부 원정 ID407
  • 원본 EXPIDYALU89401
  • 대장Kim Teuk-Hee
  • 루트 (Route)SE Face
  • 최고 도달고도8505m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 7명

이름국적역할정상 등정산소사망
Teuk-Hee KimS KoreaLeader-사용-
Jun-Suk ByunS KoreaClimber-사용-
Kyo-Sup JinS KoreaClimber성공사용사망
Sang-Ho KimS KoreaClimber---
Beong-Suk ShinS KoreaClimber-사용-
Ang Dawa SherpaNepalH-A Worker성공사용사망
Tchiring Chumbi (Tchiring Thebe) SherpaNepalH-A Worker성공사용사망

출처·참고문헌

· 1989 · 잡지 (3) · MM