한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Sapporo Chuo Workers Alpine Club Qomolangma Expedition 2002

Everest · 2002 · 봄 (1) · Japan

원정 개요

C1 at North Col.

18 May 1:30 am (NST) Nagami, Tul Bahadur Tamang and Lhakpa Chhiri started for top and on top 9:54 am and returned 4:30 pm to C3 to sleep; used oxygen sleeping in C1 by Nagami, in C2 and climbing and sleeping above C2 and return to C1 and slept ABC 19 May; Tul Bahadur and Lhakpa sleeping in C3, up to top and down to C3.

25th May summit team of Shingi Sato, Noguchi, Pemba Tshering and Phurba Chhiri used oxygen in same pattern as first summit team. 2nd team left C3 for top at 1:30 am and Sato on top 10:00, Noguchi 10:18 am; Phurba Chhiri with Sato and Pemba Tshering with Noguchi. Returned to C3 4:00 pm to sleep there. 26th down to ABC.

Funahashi went to ABC once, stayed in BC otherwise; Homma and Yamagata no higher than ABC (Yamagata went there 3 times). Sonoe Sato, Suzuki, Tada and Taniguchi went to C1 but no higher.

  • 내부 원정 ID4021
  • 원본 EXPIDEVER02104
  • 대장Shinji Sato
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 14명

이름국적역할정상 등정산소사망
Shinji SatoJapanLeader성공사용-
Masano FunahashiJapanClimber---
Naomi HommaJapanClimber---
Shigeyoshi NagamiJapanClimber성공사용-
Koji NoguchiJapanClimber성공사용-
Sonoe SatoJapanClimber---
Masahiro SuzukiJapanClimber---
Kuniko TadaJapanClimber---
Shizue TaniguchiJapanClimber---
Akira YamagataJapanClimber---
Lhakpa Chhiring/Chhiri SherpaNepalH-A Worker성공사용-
Pemba Tshering SherpaNepalH-A Worker성공사용-
Phura Chhiri (Phurba Chhiri) SherpaNepalH-A Worker성공사용-
Tul Bahadur TamangNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.