GBA Sara 2002
Ama Dablam · 2002 · 봄 (1) · Spain
원정 개요
18 April fixing rope and did this for 8 days, every night sleeping in BC (fixed to 5900m). Then decided not to continue: one member "not good condition" and "big problem with food." On 25 April carried food to 5900m and left gear there but when went up on 26th found birds had taken all food from paper containers and no food left.
- 내부 원정 ID3981
- 원본 EXPIDAMAD02104
- 대장Nemesio Matalobos
- 루트 (Route)NE Ridge/Spur (NZ 2000 rte)
- 최고 도달고도5900m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유보급·장비 (8)
참가자 3명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Nemesio Matalobos de la Iglesia | Spain | Leader | - | - | - |
| Javier Huarte Ansoain | Spain | Climber | - | - | - |
| Angel Terren | Spain | Climber | - | - | - |
출처·참고문헌
연결된 원본 Reference가 없습니다.