Czech team to Ama Dablam
Ama Dablam · 2001 · 가을 (3) · Czech Republic
원정 개요
BC above normal site at small flat area.
Up to 6000m deep powder snow. After 1st night in C1, down to Thyangboche for 4 days. 25 Sept went up again to BC. 26th in C1, 27th slept at about 6000m after slow climb and made biv. 28th tried to climb up but powder snow made climb impossible so back to C1. Impossible in alpine style without camp above C1. Down to Thyangboche 29th.
Stoklasova went to C1 on 21st and back to Thyangboche where she stayed till expedition finished.
- 내부 원정 ID3881
- 원본 EXPIDAMAD01315
- 대장Leopold Sulovsky
- 루트 (Route)SW Ridge
- 최고 도달고도6100m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유산악 상태 (5)
참가자 4명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Leopold Sulovsky | Czech Republic | Leader | - | - | - |
| Martin Kresja | Czech Republic | Climber | - | - | - |
| Jiri Mynarcik | Czech Republic | Climber | - | - | - |
| Tereza Stoklasova | Czech Republic | Climber | - | - | - |
출처·참고문헌
연결된 원본 Reference가 없습니다.