한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

DAV Summit Club Pumori Expedition

Pumori · 2000 · 가을 (3) · Germany

원정 개요

BC 100m above Kalapattar at south end of avalanche area
C1 on ridge on SE Face
C2 on top of ridge.

Put fixed rope "quite high" up to 7000m. Attempted summit 2 times unsuccessfully. Problem with big crevasse and avalanche slope on 9th and crevasse here and 12th avalanche problem on slope. In successful attempt found way towards left end of crevasse where was good ice-snow bridge and not so wide. Put 100m rope here. 16th summit bid by 4 members and 2 Sherpas starting at 4:00 am. Dressen turned back at 6400m because feet cold, while others went to top at 12:45 and 1:20 pm and returned to C2 about 4:30 pm together. C2 at 6200m is slightly low, but if make camp at East Col and then it snows, can be trapped there. Leader fixed much rope. Big serac hanging over C2 at 6600-6700m on East Ridge. Going to top you climb behind this serac, but it can be dangerous for those below.

  • 내부 원정 ID3737
  • 원본 EXPIDPUMO00303
  • 대장Zbigniew Mlynarczyk
  • 루트 (Route)SE Face/Ridge-E Col
  • 최고 도달고도7138m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 13명

이름국적역할정상 등정산소사망
Zbigniew MlynarczykGermanyLeader성공--
Norbert BannertAustriaClimber성공--
Bernhard Josef BidmonGermanyClimber---
Alexander DressenGermanyClimber---
Joachim HerrmannGermanyClimber---
Joerg NabitzGermanyClimber---
Angelo VedaniSwitzerlandClimber---
Rainer VielberthGermanyClimber---
Alfred VirantAustriaClimber---
Josef WinklerAustriaClimber성공--
Robert WinklhoferGermanyClimber---
Chhiring Dorje SherpaNepalH-A Worker성공--
Nawang Zimba SherpaNepalH-A Worker성공--

출처·참고문헌

연결된 원본 Reference가 없습니다.